Sign in Check my fit
EN
Home / Horizon Europe / HORIZON-CL4-2027-02-MAT-PROD-32-two-stage

Efficient energy input from renewable sources and energy management in the process industries (IA) (Processes4Planet and Innovative Advanced Materials for the EU partnerships)

Announced, not yet open · HORIZON Research and Innovation Actions · two-stage · HORIZON-CL4-2027-02-MAT-PROD-32-two-stage

Next cut-off
02 Feb '27
in 149 days
Per grant
€8.8M
the call's own average
Grants expected
6
projects that will be funded
Funding rate
100%
the full cost of the action

In context of Horizon Europe

This grant€8.8M
The track runs to the largest grant in Horizon Europe (€171M). The median across the 482 calls we publish is €5.3M, this one is above it.

What this call funds

Expected Outcome:

  • A significant decarbonisation of processes (measured by the reduction of GHG emissions from the overall system) with broad applicability and economic viability.
  • Facilitation of the transition from fossil-based energy inputs for: • low/medium thermal energy demands by introducing renewable-based alternatives and heat upgrading.
  • High-temperature processes, by innovative technologies for electrified and hybrid high-temperature processes, high temperature energy storage.
  • Clean energy usage is given a boost through innovative advanced materials, system concepts and technologies for energy integration and energy storage, supporting resilience against energy supply variations
  • Combination of significant energy savings and integrated management of energy systems and production processes

Scope:

Most processes in the process industries require significant energy inputs which currently lead to substantial CO2 emissions by the process industries. The reduction of the CO2 footprint can be achieved by several measures, e.g. electrification or use of other renewable sources of energy, lowering of the energy demand, increasing energy efficiency, and energy integration. This topic aims to lead to significant steps in reducing the CO2 footprint by technological innovations, at least by 20%.

A key problem in the use of renewable energy sources is their fluctuation over time. Projects should take this into account and develop solutions that aim for energy efficiency and include novel storage technologies of relevance to the process industries. Pure demand-side management by production schedules adapted to the supply of electricity from renewable sources is not within the scope of the call.

Trimmed here, the full scope, expected outcomes and award criteria are on the official topic page ↗.

Cut-offs

Later cut-off02 Sept 2027

What applying costs you

ItemEstimateNote
Drafting effort8–10 weeksshort proposal, then a full one
Partner search4–8 weeksruns in parallel, and it is the part that slips
Time to first payment9–12 monthscut-off → evaluation → grant agreement

These are Bemzu's estimates from the call's structure (the number of stages and whether a consortium is required) not figures published by the Commission. Only the co-financing share is read from the call itself.

Where these conditions come from

Two kinds of row. Most are the sentence we read the condition from, quoted out of the call itself. Some say plainly that they are not a quotation but the programme's own rule for this type of action, the EU portal publishes a table of contents where the conditions should be, so for a Research and Innovation Action the rate comes from the rulebook rather than from the fiche.

ConditionQuoted from the call, or the rule behind it
Consortium sizeNot quoted from this call — Research and Innovation Actions under the Horizon Europe rules are at least three independent legal entities from three different Member States or Associated Countries, at least one established in a Member State.
Funding rateNot quoted from this call — Research and Innovation Actions under the Horizon Europe rules are funded at 100% of eligible costs for every participant.
Maturitynull Activities are expected to start at TRL 4-5 and achieve TRL 6-7 by the end of the project – see General Annex B.

Also open in HE

Become the beneficiary.

Eight questions, no account, nothing sent anywhere. You will know which of the 1526 open calls you can actually enter before you finish your coffee.

Check my fit